Project Background
• Build online ticket system for Olympic games
• System to be used on mobile phones and PC’s
• System will allow the user to download maps – which will enable the user to navigate to the Olympic village
• System will allow the user to download maps – which will enable the user to navigate around the Olympic village (between events, maybe only needs to be available for mobile phone?)
• If user purchases ticket with a mobile phone – barcode will be sent via txt message – this will act as a ticket
• Option of viewing the stadium seats (still to discuss)
Basic Project Walkthrough
1. User buys ticket (mobile/pc)
2. Views map of how to get to Olympic village
3. Views map of how to get around Olympic village
Tasks for week 2 (14/02/07 deadline)
• Analyse user requirements
• Think of system objectives
• Research into Java servlets
• Research into J2ME
Team meeting 14/07/02 (13h30 – 15h00) PR-2A (library)
- Discuss the possibility of constructing a report which includes the scope and breakdown of the project such as project ideas, to requirements. I feel that is approach will not only help which the structure and allocation of work, but to support the 'presentation' of the final concept.
- The allocation of work
- The decision of which Software Project Cycle to use
- J2ME. Are we assuming that the use downloads an application, or will the user be required to connect to a website using WAP?
- The blog system went down yesterday, it might be wise to have a backup of the blog.
Links
- Requirements Document template - http://www.hud.gov/offices/cio/sdm/devlife/tempchecks/frtemplate.doc
Sorry ,I will not able to attend the group meeting on Wednesday as I have to attend the CISM placement fair from 2pm to 4pm.
So, could we arrange it at a different time?